Potomac Modern Farmhouse
5 bed · 5.5 bath · 6,000+ sq ft above grade
Potomac lots run larger, and that changes the work: longer drives, more grading, well and septic on some properties, and plans that can spread out rather than stack up. We design for the land first, then for the brief.
Revamp Design Build carried our Potomac Modern Farmhouse from site acquisition to finished interiors: five bedrooms and more than 6,000 square feet above grade, designed and built by one team. In Potomac the site plan matters as much as the floor plan.
Custom homes on larger lots, whole-home renovations of houses from the 1970s to the 2000s, and additions and primary suites that take advantage of the room a Potomac lot gives you.
Potomac is unincorporated, so building permits come from the Montgomery County Department of Permitting Services, the same authority as Bethesda. A new detached house needs a permit before construction starts, with the right-of-way and sediment-control applications filed alongside it. Additions and alterations have their own residential permit processes, and everything is applied for online through the department's eServices system.
Properties that are not on public water and sewer add a step. The department also issues well and septic permits: a septic permit is needed to install a system for a new home, or to upgrade or replace one so it can serve an addition, and a well permit is needed before drilling. We confirm the property's water and sewer category early, because it decides whether a well or septic permit is possible at all, and we fold those applications into the pre-construction schedule.
Where the drive runs, how the grade falls and where a septic field can go are the first decisions. We settle them before the floor plan, then design a house that fits its site.
Houses from the 1970s to the 2000s, often generous in size but dated in plan. We open them up, rebuild kitchens and baths and bring the systems up to current standards.
With room to build out rather than up, additions in Potomac can give a house the suite, the garage or the indoor-outdoor connection it never had.
It changes the order of work. Well and septic permits are issued by the county alongside the building permit, and a septic system has to be sized for the house it serves, so we deal with it in the feasibility stage rather than after the design is finished.
That is how our Potomac Modern Farmhouse ran. We assess the land, work through subdivision and zoning, shape a design around the site, price it alongside the drawings and build it with the same team.
Site costs are the part of a Potomac budget most likely to grow, so we set the working budget after assessing the site, not before. Grading, the drive, utilities and stormwater are priced as line items, and the weekly update during the build tells you where each one stands.
Tell us about the property and what you have in mind. We reply within one business day and, if the project is a fit, come and see the site.